  • Placed coping stones on the boundary of new roof that was created by previous builder
  • Removed old garden single bricked wall partitioning the grass and pathway
  • Built new double bricked wall with pillars to ensure longevity and give it extra strength 
  • Added coping stones on top of the wall to give it a good finish
  • Dug the foundations deeper for extra stability
  • Dug a trench in the alleyway to replace old metal waste pipe with a new plastic pipe as customer had constant issues with blockages as old pipe was partly broken
  • Re slab and fill the area where the pipe was replaced 
  • Replaced new beam on top of window as brick work on top of window was sagging due to lack of beam