Placed coping stones on the boundary of new roof that was created by previous builder
Removed old garden single bricked wall partitioning the grass and pathway
Built new double bricked wall with pillars to ensure longevity and give it extra strength
Added coping stones on top of the wall to give it a good finish
Dug the foundations deeper for extra stability
Dug a trench in the alleyway to replace old metal waste pipe with a new plastic pipe as customer had constant issues with blockages as old pipe was partly broken
Re slab and fill the area where the pipe was replaced
Replaced new beam on top of window as brick work on top of window was sagging due to lack of beam